How we build

How a software company runs on software

A few people set direction and make the calls that cannot be undone. Divikriti Factory does the rest: it writes the code, writes the tests, and ships through gates it cannot skip.

Four roles, every change

A person

Product

Decides what to build and writes the spec: what changes, for whom, and the test that proves it. A person owns this role.

Divikriti Factory

Builder

Writes the code and its tests, on its own branch. This is Divikriti Factory's main job.

Divikriti Factory

Verifier

Checks the change against the spec — tests in CI, then the feature itself on staging with test data. A verifier never grades its own work.

Divikriti Factory + a person

Release

Cuts the release, ships it in stages, watches the live checks, and rolls back if they fail.

AI models do much of the building and checking. People own product decisions and every release that touches money, consent or what customers can see.

The pipeline

Follow one change through

Pick a stage to see what happens there, who does it, and which gate guards it. Then send a change through — or watch a release fail and roll back.

Stages — use the arrow keys to move between them.

Idea → Spec → Build → Verify → Release

Every change, the same five stages
People
Decide what to build, write the spec and its test, and sign off anything that touches money, consent or what customers can see.
Divikriti Factory
Builds on its own branch, runs every test in CI, checks the feature on staging with test data, and ships through a release branch.
If it fails
Red never merges. A release that fails its live check rolls back to the previous version on its own.

The gates every change passes

Tests on every change

Every pull request runs the full CI suite on our own build machines: backend tests, frontend unit tests, browser tests and Divikriti Factory's own checks. Red never merges.

Stops: a change that breaks something that used to work.

Staged releases

Production runs from a release branch, never straight from the main line. A release is cut only from a main line whose required checks are green. A new server version must pass on staging before it takes live traffic.

Stops: half-finished work reaching customers.

Automatic rollback

A new backend version is started on a separate port first and must pass its checks there. It then replaces the running version; if it fails its live health check, the deploy puts the previous version back by itself. After every frontend release, a smoke test and a full user journey run against the live site; if either is red, the frontend is moved back to the previous version.

Stops: a bad release staying live.

Tenant checks

Each Diviplace customer is a separate tenant. Dedicated tests check that one tenant cannot read another's data, a guard checks new endpoints, and a scheduled canary checks the live system.

Stops: one customer's data showing up for another.

Case study: Diviplace

A real change: v1.0.38, 9 November 2026

  1. A fix made the header’s market scope (“Everywhere”) the single source for dashboards and lists.
  2. The frontend release went through the automatic promotion gate on the live site. The smoke test and the 14-step golden path passed.
  3. The countries check did not: the client form offered 3 countries instead of the full catalogue.
  4. The gate moved the frontend back to the previous version by itself, six minutes after the new one went live. It then told the founders what it had done.
  5. The cause was fixed with a test that reproduces it.
  6. The release went out again the same evening. Every gate passed: all forms offer the full country list.

What stays with people

  • What to build, and what not to build.
  • Anything that touches money, consent or what customers can see — a person signs off.
  • Every change to production infrastructure.
  • Rolling a release back on purpose.

Software runs the pipeline. People are accountable for it.